
The new central plant is key to both immediate and longer-term master plan growth and improvements on the campus and will help anchor a partially developed corner of the campus. The central plant will provide the services they need for the future dock for the new maritime training vessel and campus expansion.
PGA was chosen as the Telecommunications and Security Consultant for the design of a new Central Utility Plant to serve the entire campus and berthing dock for the new National Security Multi-Mission Vessel. The scope included the preparation of drawings and specifications to be included with a comprehensive set of construction documents developed by the architect.
Comments