The MODE Project was commenced to drill one well at Mupeji 1 (approx 105 km due west from Inhassoro in Mozambique waters) to commence by July 2012 with the Option of Drilling a second Well (Mupeji 2) based on the findings on the first Well.
PGA Engineers, Inc. provided expert Cost Modeling, Vendor Management, and Engineering Analysis for the provision of a robust Telecommunications and IT Broadband Back-Bone Infrastructure linking the 3 Operational Sites (Offshore Rig, Beira Project Office, Rosebank Head-Office), and with each Site fully equipped with suitable Site Specific IT & Communications Equipment such that pre-determined and agreed Service Levels are achieved at each site. The final solution consisted of VSAT Satellite Communications, IT Data Network, Air/Marine VHF Radio Systems, and 24 hours battery backup and emergency power.