top of page
PGA Logo.png

Freeport LNG Liquefaction Expansion, Freeport, Texas

As a consulting engineer to Honeywell Process Solutions, PGA Engineers is providing front-end engineering and design (FEED) services for all communications systems. Owner workshops, basis of design and specifications are being developed for microwave, plant radio systems, LAN, WAN, and Public Address/General Alarm (PAGA). Construction is scheduled to begin in 2013 with completion in 2016 and a cost of $4 billion.

Project

To design a communications system that encompasses various communication methods throughout the facility.

Related Projects

Oil and Gas

Exxon Mobile, GCGV Chemical Plant, Administration Complex

Oil and Gas

Chevron Phillips Chemical, USGC II Ethylene Project

Oil and Gas

Sasol, Lake Charles Chemicals Project

bottom of page